Planning Hotel Furniture for New Openings and Renovations

22-01-2024 11:45
Planning Hotel Furniture for New Openings and Renovations

A new hotel opening involves planning all furniture areas together, while a renovation also needs to account for retained items and ongoing operations. Both require clear requirements and an approval programme. Review hospitality furniture through an area-by-area production brief.

Prepare starting information for the project type

For a new opening, list room types, shared areas and capacity. For refurbishment, add retained furniture, dimensions and finish references. Share doorway, lift and building access for both scenarios. Show the practical need behind bespoke dimensions on the layout.

Define product groups and approval responsibilities

Record dining chairs, tables, armchairs and other seating separately. Identify who approves models, finishes and dimensions. A shared schedule helps design and operations teams track changes consistently.

Complete sample approvals before production

Try furniture in an arrangement close to the planned use. Assess seating, table approach, cleaning and circulation together. Compare finishes and upholstery under the lighting references. Retain the approved models, dimensions and materials in writing.

Match delivery with opening or renovation phases

Assess manufacturing, shipping and internal placement time separately. For refurbishment, plan occupied areas and temporary storage. Share the updated schedule when quantities or dimensions change. Define the international delivery scope and required documentation during quotation.

Share the brief with the manufacturer

Sandalyeonline is a Turkey-based B2B contract and hospitality furniture manufacturer serving international projects. Send area schedules, layouts, finish references and the programme to our export team to assess standard and bespoke production options.